Sequencing, snagging and site safety, from the people on site.
Trades, supervisors and site managers each see a different part of the job. Ask all of them, and see where it breaks.
What comes back
From 28 conversations to a sop and a ranked report
- 28
- People asked
- 5
- Languages
- 6
- Days
On your last second fix, what was still unfinished when you arrived?
Plastering wasn't done in two rooms, so we left the faceplates off and came back a week later.
Electrician, 8 years
Who told you the rooms were ready that day?
On their phone or laptop, talking or typing, in their own language.
Second fix sequence
- 01Confirm plastering is signed off per room
- 02Book second fix only after the sign-off
- 03Share the sequence with every trade weekly
- 04Snag each room before the trade leaves
Written from what people said, in their words. You check it and share it.
Trades arrive before the last trade has finished
17 of 28Site plan order differs from what trades do
13 of 28Snags found after the trade has left site
9 of 28
“The plan says one order. The trades work to another.”
Example
Two trips for the faceplates
- Second fix
The electricians arrive before the plasterers have finished.
- A week later
A second trip to fit the faceplates.
- In the interviews
The site plan says one order; the trades follow another.
One sequence per site, kept by the site manager and shared with every trade.