What your best operators know about the line.
Changeovers, faults and first-off checks: ask the people who run the line, on their phone, between batches.
What comes back
From 36 conversations to a sop and a ranked report
- 36
- People asked
- 3
- Languages
- 4
- Days
Think of your last changeover on line 2. What did you do before the run ended?
We get the next tooling on the trolley and by the press during the last run. Saves a good quarter of an hour.
Operator, nights
Who decides which tooling goes on the trolley first?
On their phone or laptop, talking or typing, in their own language.
Line 2 changeover
- 01Stage the next tooling during the last run
- 02Set the guards and clamps in one pass
- 03Run a first-off and check it at the press
- 04Sign off the first-off before the batch
Written from what people said, in their words. You check it and share it.
Changeovers slow when tooling isn't staged
22 of 36Faults reset on the line and never logged
15 of 36First-off checks skipped on short runs
9 of 36
“Nights change over in 25 minutes. It's the trolley, that's all.”
Example
Why nights change over faster
- Line 2
Changeovers take 40 minutes on days and 25 on nights.
- In the interviews
The night crew stages the tooling during the last run.
- Written down
A changeover SOP with that step in it, in the night crew's words.
Day shift follows the same SOP from Monday.