Hear the risks people see and don't report.
A short, private conversation, in their own language, gets said what a form never does.
What comes back
From 22 conversations to a checklist and a ranked report
- 22
- People asked
- 5
- Languages
- 5
- Days
Think of the last hot work job you did. Did it finish before the permit ran out?
No, it ran about an hour over. The supervisor was at the other site, so we carried on. Happens a lot.
Welder, contractor
What would make it quick to get the permit extended?
On their phone or laptop, talking or typing, in their own language.
Hot work permit extension
- 01Stop work when the permit time is up
- 02Call the shift supervisor to extend
- 03Re-check the area and the fire watch
- 04Write the new end time on the permit
Written from what people said, in their words. You check it and share it.
Permits running over without being re-issued
7 of 22Supervisor off site when a permit needs signing
6 of 22Quality faults caught but never reported
5 of 22
“Nobody's going to down tools for a signature.”
Example
A permit that ran over
- Morning
Hot work is permitted until 12:00.
- Afternoon
The job runs over. Nobody re-issues the permit; the crew carries on.
- In the interviews
7 of 22 describe permits running over, at two sites.
A permit extension step, signed by the shift supervisor.