Hear the risks people see and don't report.

A short, private conversation, in their own language, gets said what a form never does.

What comes back

From 22 conversations to a checklist and a ranked report

22
People asked
5
Languages
5
Days
The interviewAI

Think of the last hot work job you did. Did it finish before the permit ran out?

No, it ran about an hour over. The supervisor was at the other site, so we carried on. Happens a lot.

Welder, contractor

What would make it quick to get the permit extended?

On their phone or laptop, talking or typing, in their own language.

ChecklistFrom 7 people

Hot work permit extension

  1. 01Stop work when the permit time is up
  2. 02Call the shift supervisor to extend
  3. 03Re-check the area and the fire watch
  4. 04Write the new end time on the permit

Written from what people said, in their words. You check it and share it.

What goes wrongRanked
  1. Permits running over without being re-issued

    7 of 22
  2. Supervisor off site when a permit needs signing

    6 of 22
  3. Quality faults caught but never reported

    5 of 22

“Nobody's going to down tools for a signature.”

Fitter, site 2

Example

A permit that ran over

  1. Morning

    Hot work is permitted until 12:00.

  2. Afternoon

    The job runs over. Nobody re-issues the permit; the crew carries on.

  3. In the interviews

    7 of 22 describe permits running over, at two sites.

What changed

A permit extension step, signed by the shift supervisor.