Surveys, kit lists and commissioning, the way your installers do it.

Ask the installers what the survey missed and what they check before they leave, then write it into the job.

What comes back

From 14 conversations to a checklist and a ranked report

14
People asked
2
Languages
4
Days
The interviewAI

Tell me about the last install day that went wrong. What did the survey miss?

The flue. The survey had the boiler model but not the flue run, so I turned up with the wrong kit.

Installer, 10 years

What would the surveyor need to look at to get the flue right?

On their phone or laptop, talking or typing, in their own language.

ChecklistFrom 12 people

Survey checklist, from the installer's side

  1. 01Record the flue type, length and exit point
  2. 02Photograph the boiler and the flue terminal
  3. 03Note the pipe sizes at the boiler
  4. 04Check access for the new unit

Written from what people said, in their words. You check it and share it.

What goes wrongRanked
  1. Flue not recorded on the survey

    8 of 14
  2. Pipe sizes missing from the survey

    6 of 14
  3. Kit list doesn't match the job

    4 of 14

“I keep a flue kit in the van now, just in case.”

Installer

Example

A wasted install day

  1. Survey

    The surveyor notes the boiler model, not the flue.

  2. Install day

    The installer arrives without the right flue kit.

  3. In the interviews

    8 of 14 installers have lost a day the same way.

What changed

A flue line added to the survey form.

More industries

See it with your own example

Thirty minutes with our team, using a question from your own work.

Book a demo